An engineer is required to visit a factory for exactly four days during the first 15 days of every month and…
An engineer is required to visit a factory for exactly four days during the first days of every month and it is mandatory that no two visits take place on consecutive days. Then the number of all possible ways in which such visits to the factory can be made by the engineer during June is_____
Solution
Selection of non-consecutive days out of days is same as first remove objects from objects, so remainging objects are having gaps in which these objects can be placed again.